Liao Fang [Senior Engineer]
BACK
Liao Fang
Geological Survey and Mineral Exploration Senior Engineer
Water, Construction and Environment Engineer
In Jun. 2004, he graduated from Chengdu University of Technology and gained the bachelor of Environmental Engineering.
In Jun. 2007, he graduated from Chengdu University of Technology and gained the master degree of Environmental Engineering.
In Sep. 2007, he gained the course-completion certificate of advanced training course of Phase III solid mineral exploration theory and technology method for the national geological team technology responsible person.
In Mar. 2010, he gained the course-completion certificate of ore prospecting technology and geological ore prospecting theory training class of Sichuan Bureau of Geology and Mineral Resources.
In Nov. 2015, he gained concurrent certificate of geological data.
In May 2017, he gained the professional skill training certificate of site environment evaluation issued by Chinese Society for Environmental Sciences.
In May 2017, he gained the evaluation and repair engineer certificate of soil and groundwater issued by China Association for Continuing Engineering Education.
Main Achievements
In 2009, he engaged in the gold ore pre-survey project of Wajin Ditch, and found one Gold Deposit with small scale.
From 2010 to 2011, he engaged in the detailed survey of Xinjiang drip copper mine, and the final result of the detailed survey report is reported to reserve evaluation center of Xinjiang for review, filed in Land and Resources Department of Xinjiang, and submitted to medium-sized copper deposit.
From 2012 to 2013, he engaged in the detailed survey of manganese ore in Majia, Muli County, the detailed survey report passed the review of reserve evaluation center of Sichuan Province, filed in Land and Resources Department of Sichuan Province and submitted to small-scale manganese ore deposit.
From 2014 to 2015, he engaged in the detailed survey of lead zinc ore in Jiamenguan, Hanyuan County and in Daniuchang, and final result of detailed survey report passed the review of reserve evaluation center of Sichuan Province, filed in Land and Resources Department of Sichuan Province and submitted to two small scale lead and zinc deposits.
From 2016 to 2017, he engaged in the covered mineral resource project of construction engineering such as Yinjiang hydropower station, Jiaopingdu Bridge, Yinjiang Highway Bridge, etc., the final results passed the review of Land and Resources Department of Sichuan Province and were filed.
Published 6 papers
AddTime:  2017-11-14 Views: 1745 Source: SCQD Author: admin